This study is to investigate a lifting equipment installation of scaffolding in a construction site.
The equipment is foldable to be easy to carry. it must also allow the ground on scaffolding installation without the operator rises in height.
The goal of this development is to place the operator safely, save time for the installation and reduce the number of operators.
This equipment can lift the scaffolding up to 8 meters.
Voting
-
ABOUT THE ENTRANT
- Name:Mahran Mnassri
- Type of entry:individual
- Profession:
- Software used for this entry:CATIA V5
- Patent status:none