BP Oil spill Repair

Votes: 0
Views: 5127

This is a rough drawing to show my idea. It consists of a machine that would be lowered over a semi straight area of the 21" diameter pipe. A hinged clamp would then be rotated around and bolts would be tightened.
A saw then pivots around and cuts a clean surface for a cap to seal against.
The rubber faced cap is then installed with studs and nuts.
There are things that can be done to help with the assembly that I did not include in the drawing. Also for simplicity I did not completely draw the band saw.
I own an Aerospace machine shop near Dallas and I could have one of these machines ready to go in less than two weeks.
This idea is simple and can be installed with rovs.

Voting

Voting is closed!

  • ABOUT THE ENTRANT

  • Name:
    Lonny Doyle
  • Type of entry:
    individual
  • Profession:
    Machinist
  • Number of times previously entering contest:
    never
  • Lonny's favorite design and analysis tools:
    Solid Works
  • For managing CAD data Lonny's company uses:
    SolidWorks PDMWorks
  • Lonny's hobbies and activities:
    Racing, RC models, Inventing and Prototypes
  • Lonny is inspired by:
    Needs for a greener future.
  • Patent status:
    none